CASE STUDY:
Marchwood 'Energy-from-Waste' Plant

Contractor:

Client:

Location:

Value:

CNIM

ONYX Waste Systems

 

Southampton, UK

Circa £2.8 billion

Summary of Works:

PHC Group supplied full project management and construction services for the erection of structural steelwork and the unique “Space-Frame” Dome structure and cladding, providing all documentation, RAMS and procedures for the main-contractor CNIM. PHC also participated in selection of cranes and plant requirements at site, together with all transportation, storage and material ordering for the architectural coverings and specialist cladding.

Utilising the PHC rope-access services for both the steelwork and the space-frame erection provided the client with a “safe and secure” means of construction on such a prominent project, The “Jewel-in-the-Crown” for ONYX / Veolia waste the project went on to win numerous awards for the Unique Design.   