Over the past few years, the PHC Group has diversified from its original beginnings of heavy steel construction by developing techniques and construction methodology relating to the new and varied means of construction requirements. Today’s market sees an ever-increasing appetite for “off-site” assembly and fabrication such as; LGSF, modular and volumetric, these methods of manufacture reduce reliance for on-site traditional methods of construction.
​
The PHC Group already has considerable experience in these sectors including projects carried out on; Student accommodations, Multi-storey Hotel developments, Office blocks and Residential apartments.
Our experience in this field includes but not limited to:
​
-
LGSF – Light Gauge Steel Frame
-
Volumetric Modular
-
Hybrid – CLT / Steel
-
PODS – Modular sections
-
Structural Timber
-
Precast Concrete
​
​
View our Case Studies below and contact us for your MMC project requirements.
​
​